HPAC was engaged to modify the existing mechanical systems servicing the existing hospital and supply and install an additional chiller to supply the existing services to increase the A/C capacity of the hospital and reduce the amount of humidity being generator in the CSSD department.

These works included modification to the plant enclosure, relocation of 2 existing chillers and extension of plant enclosure to enable new chiller to be installed.

New chilled water pipework and header tank with bypass needed to be installed so that the existing chillers remained fully operational while the new chiller was being installed.