Won through a competitive tender process, the scope of this project included converting the existing MacKillop Pavilion structures at the school into a Senior Commons facility including breakout facilities, flexible learning spaces, kitchenette facility, and flexible events/function space. Working with the client, HPAC aided with value engineering to reduce construction costs.
The works were carried out while the school remained open to students and staff with careful consideration for vehicle movements and materials handling in close proximity to students. The project was completed on time and under budget to the satisfaction of the school’s stakeholders.